National Research Council Canada
Draft Saved. Your draft will be available for 30 days.
Draft Loaded.
You have a draft saved from a previous session. Would you like to load the saved draft? Load Saved Draft
Save Draft for later Click the link above to save the contents of your form (Javascript and cookies required). When you come back to the form, you can click a link to load the saved contents. For the security of your files, any previously attached files will not be saved in a draft. When a saved draft is reloaded, you must select your files to attach again.
Incomplete application forms with missing information and without a product sample may delay the evaluation.
Please provide contact information for the organization making this application, who will be the report/listing holder.
Please provide contact information for the person in the applicant organization who is responsible for this application. They will receive invoices and will have authority to sign on behalf of the organization.
Please provide contact information for the main TECHNICAL person for this application if different from the Organization Contact in section 3 above. They will be the main contact for all technical issues related to this product application.
Please provide information about the owner of the product, to be used when publishing the evaluation.
Please provide locations of all manufacturing plants that produce the product.
Indicate the level of expertise necessary to install the product/system.
Return to footnote 5 Construction practices - standard Canadian methods used to construct a building.
Select ONE of the following, and answer the questions displayed for that section. The product is to be evaluated:
Return to footnote 6 Acceptable solutions are those that comply with all the applicable provisions in Division B of the NBC.
Return to footnote 7 Alternative solutions are those that differ from acceptable solutions in Division B, but achieve at least the minimum level of performance required in Division B in areas defined by the objectives and functional statements attributed to the applicable acceptable solutions.
A sample of the product must be provided.
The sample should be a representative portion of the product showing its main components and characteristic elements.
Send the sample to:
Canadian Construction Materials CentreNRC ConstructionNational Research Council CanadaBuilding M-24, 1200 Montreal RoadOttawa, Ontario K1A 0R6
Note: Incomplete application forms with missing information and without a product sample may delay the evaluation.