Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats by contacting us.
Printable version (PDF document)
Team Mission Log
Team Name
| Communication Elements | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
Email (each team member)
|
Mentors, Teacher-Coordinator | |
Web Page / Team Blog
|
Teacher-Coordinator, CNM Office | |
Web Page / Team Blog
|
Teacher-Coordinator, CNM Office | |
| Special Activities | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
Mission Patch
|
Art/Language Teacher, Artist | |
Science and Technology Challenge
|
Science teacher, CNM Office | |
System Activity
|
Mentor, Community, Teacher-Coordinator | |
| Life-Support System Design | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
Preliminary Sketches, Diagrams
Written Descriptions
|
Teacher-Coordinator, Principal, Librarian or Mentor | |
System Designed and Constructed
|
||
| System Fits size requirements 1 metre x 1 metre x 1 metre |
||
| Presentations Prepared for Link-up Day | ||
| Mars facts labelled | Volunteer or Mentor | |
| Working Plans in portfolio | ||
| Link-up Day: System Presentation One | ||
| Link-up Day: System Presentation Two | ||
| Link-up Day: System Presentation Three | ||
| Habitat Crew | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
Communication Elements (at least 2)
|
School Support, Teacher-Coordinator | |
Habitat Design Established
|
Teacher-Coordinators from all 3 teams | |
Manifest Lists
|
Volunteer, Mentor | |
| Habitat Construction | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
| Habitat fits size requirements | ||
| Special effects included | ||
| Power strip with circuit breaker used | ||
Construction
|
Volunteer, Mentor | |
Special Signs Posted
|
||
| Team Lunch | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
| Four Food Groups Included | ||
| Fits Canada Food Guide for Nutrition | ||
Criteria Used:
|
||
| Menu Plan Available on Link-up Day | ||
| Practice Lunch Activity (Some sites will not measure food on Link-up Day) |
||
| Team Uniform | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
| Coordinated pants Coordinated shirts |
||
Other elements
|
||
| Habitat Crew Uniform (optional) | Volunteer | |
| Link-Up Day Roles | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
|
||
| Additional Roles (optional) | ||
| Link-Up Day Activities | ||
|---|---|---|
| Component | Date(s) | Verification Signature(s) Select from approved list |
| Science and Technology Challenge | ||
| Internet Café | ||
Digital Pictures
|
||
| Special Activity | ||
| Special Activity | ||
| Special Activity | ||