NRC's commitment

NRC is committed to minimizing the impact of its disruptive activities on its neighbouring communities. To that effect, we have taken several measures to reduce noise and odours stemming from our operations. These measures are listed below.

Mitigation Activity Status
Noise Studies
M6 Heating Plant Plate Cooler Study
Complete
M6 Heating Plant Noise Study
Complete
M10 Test Cell 3 Noise Study
Complete
M10 F Rooftop and Building Acoustical Study
Complete
M10 8 Mega Watt Compressor Piping Noise Study
Complete
M11 Air Supply (IATS) Blow-off Noise Study
Complete
M11 Ambient Exhaust Noise Study
Complete
M12 Roof Top Fan Noise Study
Complete
M46 Wind Tunnel Monitoring
Complete
Community Background Noise Study
Complete
Community Noise Study
Complete
Electrical Yard Noise Review
Complete
M10 Silencer assessment
In progress
Odour Panel and Chemical Analysis Studies
M6 Heating Plant Boiler Efficiency Testing
Complete
Odour Panel Study of Stack Emissions
Complete
M10F Thermal Oxidizer Design and Installation
In progress
Constant Emissions Monitoring and Calibration System
Complete
Silencer and Noise Insulation Purchases and Installations
M6 Heating Plant Plate Cooler
Complete
M10 Altitude Facility (RATFAC) Air Intake Silencer
Complete
M10 F Air Intake Louver Silencers
Complete
M10 F Test Cell Door Replacement
Complete
M10 F Silencer Gate Valve Installation
Complete
M10F Pipe Lagging
Complete
M10F Stack Lagging
In progress
M10F Roof Top Noise Barrier
Complete
M10 8 Mega Watt Compressor Air Intake Louver Replacement
Complete
M10 8 Mega Watt Compressor Pipe Noise insulation
Complete
M11 Ambient Exhaust Silencer
Complete
M11 Air Supply (IATS) Blow-off Silencer
Complete
M12 Roof Top Fan Replacement and Modification to Settings
Complete
M46 Wind Tunnel Blow-off Silencer
Complete
Engineering Structural Reviews
M10 Building Exhaust Fan Silencers
Complete
M10 High Bay Make-Up Air Intake Silencers
Complete
M10 Altitude Facility (RATFAC) Intake System Overhaul
Complete
M10 8 Mega Watt Intake Silencer
Complete
M10 8 Mega Watt Exhaust Lagging
Complete
M10 F Rooftop Noise Barrier
Complete
M11 Compressor Silencer
Complete
M11 Dehydration Unit Blow-off Valve Silencer
Complete
M11 Roof Top Chiller Enclosures
Complete
M11 System Exhaust Fan Enclosure
Complete
M19 Road Side Chiller Replacement/Relocations
Complete
M46 Wind tunnel Acoustical Design Review
Complete
M46 Intake Fan - Review of Active Noise Cancellation
Complete
Equipment Purchases and Equipment Upgrade
Emission Analysis System
Complete
Meteorological Station Hardware Upgrades
Complete
Meteorological Station Software Upgrades for Real-time Data
Complete
Noise Monitoring Equipment
Complete
Constant Noise Monitoring System
Complete